KERBEROS Lite 110.B

Kerberos Lite 110.B

basic parameters

  • Recommended boiler volume: 100 - 300 litres
  • Photovoltaic panel power: approx. 1 - 2 kWp
  • Typical number of panels: 4 - 8 x 260 Wp
  • Recommended heater input: 1.5 - 2.5 kW
  • Grid heating backup: NO
  • Control: internal DIP switch
  • Production / consumption monitoring: NO
  • Utilization of energy surpluses: NO
TECHNICal DATA
  • Input open-circuit voltage (limits): 140 - 340 V
  • MPP tracker range: NO MPPT
  • Maximum current: 10A
  • Thermal fuse: YES electronic
  • Mains connection: NO
  • Ingress protection IP20
 
Documents to download here

 

warning

We only recommend the number and power of photovoltaic panels. Panels are available in various designs on the market, and if the technical requirements are met, it is not necessary to follow the recommended panel performance. The maximum idle input voltage must be observed in all circumstances - the negative thermal coefficient of the PV panels must be taken into account!